Â鶹´«Ã½

Skip to content

Pipeline News

Company that started in Moosomin in 1900 again in Saskatchewan

Moosomin, Saskatoon – A company that started in Moosomin 118-years ago had returned to Saskatchewan. E.B.
MANTL launching new surface pump for gas injection

MANTL launching new surface pump for gas injection

Moosomin – Moosomin may be on the fringe of the southeast Saskatchewan oilpatch, but its location was actually quite central to the sales of MANTL Canada, an independent progressing cavity pump (PCP) manufacturer.
Moosomin’s IJACK is changing pumpjacks and gas compression

Moosomin’s IJACK is changing pumpjacks and gas compression

When the downturn hit, new gas compression products saved the day
Carbon capture at Shand could cost as much as 67 per cent less, per tonne, compared to BD3

Carbon capture at Shand could cost as much as 67 per cent less, per tonne, compared to BD3

Feasibility study integrates lessons learned from BD3
Positive reaction to DEEP geothermal project tour

Positive reaction to DEEP geothermal project tour

Torquay – With the drilling rig having reached 2,700 metres already out of a planned 3,500 metres, the first well in a geothermal electrical power project was well underway on Nov. 23.
If Energy East ever happens, Moosomin is key

If Energy East ever happens, Moosomin is key

Moosomin has a unique place in the Saskatchewan oilpatch. On the edge of oil production, there’s long be a few pumpjacks running north of town. But the number of directly-related oilpatch businesses has diminished over time.
Precision Terminates Agreement With Trinidad

Precision Terminates Agreement With Trinidad

Precision Drilling Corporation has terminated the arrangement agreement dated Oct. 5, 2018 , with Trinidad Drilling Ltd. following the announcement by Ensign Energy Services Inc. that it had taken up 56.
Deep Earth Energy Production commences drilling on geothermal power project

Deep Earth Energy Production commences drilling on geothermal power project

Geothermal project uses existing oilfield technology and processes
Saturn hits 1,000 barrels per day production milestone

Saturn hits 1,000 barrels per day production milestone

Saskatoon –Saturn Oil & Gas Inc. announced on Nov. 19 that with the success of the recent drill program the Company has achieved a production rate of 1,000 bpd.
Dramatic oil price drop hasn’t affected Saskatchewan rig count yet

Dramatic oil price drop hasn’t affected Saskatchewan rig count yet

Estevan – The dramatic decline in the price of oil, down to the mid-US$50s by Nov. 13, has not yet been reflected in Saskatchewan’s active drilling rig count on that same day. According to sister publication Rig Locator ( riglocator.
push icon
Be the first to read breaking stories. Enable push notifications on your device. Disable anytime.
No thanks